Fort Riley—Asbestos Abatement and Structural Demolition—Multiple Buildings

PROJECT SCOPE SUMMARY

Deconstruction (hand demolition) of multiple buildings
Concrete breaking/crushing/cutting for demolition
Demolition of a variety of structures and use types
Environmental hazards abatement (incl. friable asbestos)

Containment fabrication at Building 471.  Friable asbestos containing materials were present within this building.

Utility location and removal/termination
Other regulated material removal (Freon, mercury)
Approved submittals included Work and Safety Plans
Recycling initiative/goal was exceeded

Containment fabrication at Building 471.  Friable asbestos containing materials were present within this building.