30
Jan

Alabama Power – Powell Avenue Steam Plant

Environmental Services including Asbestos Removal and Lead Based Paint Remediation: This contract was selected to demonstrate project experience related to Environmental Remediation Services for an Extremely Sensitive client and effective coordination around multiple trades and a dynamic work environment: Asbestos Removal Roofing system demolition Working at excessive heights Approved submittals included Work and Safety Plans The 62,000 square foot Powell
Read more
30
Jan

Guntersville Dam—Electrical Stator Walnut Blasting

Project Highlights Sensitive media blasting is unique in that it not only requires standard containment but also requires the workers to be flexible in accessing and treating the media. In this photo, LECs experienced workers built a staircase within containment to reach the media Environmental Remediation Services Sensitive work environment / client needs Stator blasting requires highly skilled & unique
Read more
30
Jan

Fort Riley—Asbestos Abatement and Structural Demolition—Multiple Buildings

PROJECT SCOPE SUMMARY Deconstruction (hand demolition) of multiple buildings Concrete breaking/crushing/cutting for demolition Demolition of a variety of structures and use types Environmental hazards abatement (incl. friable asbestos) Containment fabrication at Building 471.  Friable asbestos containing materials were present within this building. Utility location and removal/termination Other regulated material removal (Freon, mercury) Approved submittals included Work and Safety Plans Recycling
Read more
30
Jan

Randolph Air Force Base – Bldg. 861 – Mold Remediation and Rebuild

Project Highlights This contract was selected to demonstrate our project experience in providing Mold Remediation /Interior demolition services during periods of occupancy by the owner and coordination around multiple trades: Deconstruction (hand demolition) of system furniture and all interior finishes throughout multiple buildings Demolition of Critical Systems Submittals including safety plans & work plans This project consisted of the removal
Read more
30
Jan

Regions Center – Branch Re-Location – Regions Headquarters Building 30 Story Tower

RELEVENCY: Environmental Services including Asbestos Removal: This contract was selected to demonstrate our project experience in providing Environmental Remediation Services for an Extremely Sensitive client and coordination around multiple trades in an occupied Building: Asbestos Removal and Disposal Occupied Building Specialized Scaffold Erection Submittals including safety plans & work plans Lakeshore recently completed a unique asbestos abatement and selective demolition
Read more
14
Jan

Samford College of Health Sciences – Selective Demolition

RELEVANCY: Environmental Services including Asbestos Removal: This contract was selected to demonstrate our project experience in providing Interior demolition services during periods of occupancy by the owner and coordination around multiple trades: Deconstruction (hand demolition) of system furniture and all interior finishes throughout multiple buildings Concrete breaking and cutting for demolition Working at heights – Extensive Roof Planter System  Demolition
Read more
13
Jan

AT&T Southeastern Regional Environmental Contract

RELEVANCY: Environmental Services including Asbestos Removal, Lead Based Paint Remediation and Mold Remediation: This contract was selected to demonstrate our project experience in providing Environmental Remediation Services for an Extremely Sensitive client over a decade covering multiple states during periods of occupancy by the owner and coordination around multiple trades: Asbestos Removal Working at heights – Extensive Asbestos Roof Removal
Read more
4
Jan

TVA Guntersville Dam – Walnut Shell Blasting

NCY: Environmental Services including Asbestos Removal and Lead Based Paint Remediation: This contract was selected to demonstrate our project experience in providing Environmental Remediation Services for an Extremely Sensitive client and coordination around multiple trades: LEC performed the Walnut Cleaning of the Stator a very few contractors are able to perform blasting on Sensitive Electrical Stators. LEC has an impeccable
Read more
3
Jan

Regions Center, Birmingham, Alabama (14th Floor Water Damage)

At 4:00 A.M. on a Sunday morning, a two inch (2") domestic hot water pipe failed at a joint on the 14th Floor.  Hot water flooded the floor until steam finally set off the fire alarm system at which time the building maintenance shut off the line.  However, water had already migrated to the lower lobby, thirteen (13) floors below.
Read more